Before commercial roof work begins on an occupied building, bring the building’s operating needs into the planning conversation. Share operating hours, delivery routines, access constraints and sensitive interior activities. Then ask the contractor to confirm how the proposed work will interact with those needs, who will communicate changes and which decisions remain unresolved.

This preparation starts after the proposed roofing work has been clarified. It is not a guide to choosing materials, approving drainage changes or prescribing installation methods. The facility manager’s role here is to explain how the building is used and coordinate the people who depend on it.

Identify decision-makers and communication contacts

Separate authority to approve changes from responsibility for sharing information. A building owner may make a decision while a facility manager, tenant representative or department lead needs to communicate its effect. Record those roles before work begins rather than assuming every message should go to the same person.

  • Identify the building representative authorized to approve operational arrangements and refer changes affecting project scope.
  • Name the day-to-day building contact and a backup if that person is unavailable.
  • Ask the contractor to identify the project contact and the appropriate contact for an urgent concern during work.
  • List the tenant, security, receiving and department contacts who need relevant updates.

Share operating hours and activities that need coordination

Describe the building’s actual routine, not just its public opening hours. Include staff arrival and departure patterns, receiving periods, scheduled events and activities with limited flexibility. Mark each constraint as either a requirement or a preference so the contractor knows which conflicts need a decision.

For deliveries, identify the entrances and loading areas normally used, along with the person who can coordinate a change. If a delivery route might overlap with a proposed staging area, ask whether the arrangements are compatible. Do not redirect deliveries or announce an alternate entrance until the relevant parties have confirmed it.

Ask the contractor to confirm access and staging

Supply information about gates, locks, security check-in, parking restrictions and shared access routes. The contractor should confirm the access, staging and restricted-area arrangements needed for the work. A space that appears available on a site plan may still be used by occupants, deliveries or another service provider.

  • Which entrances and routes are proposed for crew access, material deliveries and waste removal?
  • Which parking, loading or outdoor areas are requested for staging, and who must approve their use?
  • Could the proposed arrangements affect occupant entrances, accessible routes or emergency access, and who must resolve those conflicts?
  • Who will establish and communicate any work-area restrictions, and how should occupants report an access concern?

Note Building coordination is not construction safety planning. Do not access the roof, move rooftop equipment or establish construction safety controls yourself. Ask the contractor and responsible professionals to confirm those arrangements.

Identify equipment contacts and sensitive interior areas

Use existing building records to identify rooftop equipment and the companies responsible for servicing it. Share available equipment locations, service contacts and any known operating constraints. Ask whether the roof work requires coordination with those providers; do not assume equipment must be moved or service must be interrupted.

Also identify interior areas where disruption would be particularly difficult: inventory storage, records, occupied workspaces or activities sensitive to noise, vibration, dust or odors. These are concerns to discuss, not predictions about what the project will produce. Ask which concerns apply to the proposed work and whether any occupant or interior arrangements need confirmation.

If a proposed arrangement involves changing equipment service, moving contents or limiting use of a room, record who can authorize it and who would carry it out. Keep the item unresolved until those responsibilities are confirmed. Avoid treating a request for coordination as a promise that a particular protection measure will be provided.

Agree on how occupants will hear about changes

Ask the contractor how schedule changes, access changes and potential interruptions will be communicated to the building contact. Then decide who will pass the relevant information to occupants, delivery contacts and service providers. Keep confirmed arrangements separate from tentative plans.

An occupant notice should explain the confirmed work timing, any agreed access or parking changes, the contact for questions and how updates will be issued. Avoid promising uninterrupted operations. If a detail is still pending, say so rather than presenting it as settled.

Confirm how occupants should report an unexpected concern and who will receive it. When plans change, update the shared coordination record and replace outdated notices so different groups are not acting on conflicting information.

Use a shared pre-work coordination checklist

Use the checklist below as a working record, not proof that an arrangement has been approved. For each topic, add the responsible person, the confirmation received and any outstanding question. Mark an item not applicable only after checking it with the relevant party.

Topic Manager supplies Contractor confirms Decision record
Contacts Decision-maker, daily contact, backup and notification recipients. Project contact and route for urgent concerns. Responsible person: ___; confirmation: ___; open question: ___.
Operating hours Occupancy patterns, fixed activities and scheduling preferences. Compatibility with proposed work timing and conflicts to resolve. Responsible person: ___; confirmation: ___; open question: ___.
Deliveries Receiving routines, loading areas and delivery contact. Whether delivery routes conflict with proposed site arrangements. Responsible person: ___; confirmation: ___; open question: ___.
Access and staging Security requirements, shared routes and parking constraints. Proposed access routes, staging areas and restriction arrangements. Responsible person: ___; confirmation: ___; open question: ___.
Rooftop equipment Available equipment records, service contacts and operating constraints. Whether equipment-service coordination is needed and who must participate. Responsible person: ___; confirmation: ___; open question: ___.
Interior concerns Sensitive activities, inventory locations and affected department contacts. Relevant effects of the proposed work and arrangements needing agreement. Responsible person: ___; confirmation: ___; open question: ___.
Communications Notice recipients, communication channels and person issuing updates. How schedule changes and potential interruptions reach the building contact. Responsible person: ___; confirmation: ___; open question: ___.

Before issuing final occupant instructions, revisit the open questions with the contractor and affected building representatives. Ask which unresolved items affect the planned start or building use, assign each to someone who can resolve it and record the resulting decision.

Bring building-use information to the planning conversation